3-rail and 4-rail technologies are bundled in the 09-32 4S to ensure careful track handling.
The split-head equipment positions the tamping aggregates individually, and this even allows tamping below B75 sleepers.

09-32 4S

Success thanks to 3-rail and 4-rail

The Wiebe Group uses the track and switch tamping machine 09-32 4S for all kinds of track construction and tamping tasks. The 3-rail and 4-rail equipment delivery excellent tamping results below the sleepers whilst at the same time handling the track extremely carefully.

The split-head equipment also allows individual positioning of the tamping aggregates and excellent tamping below B75 sleepers. The semi-aggregates can also be set so that the tongue and core areas of the switches are also tamped to the optimum.

Total mass in tonnes

Axles

Metres/hour tamping output

A split core for whole tasks

The B75 sleeper was developed to cope with the increasing speeds and axles loads of rail traffic and the construction of railways systems. Its overall length of 2.8 metres means it has a larger lateral displacement resistance and also new requirements in terms of maintenance and processing machines, which is why the 09-32 4S has split-head equipment. Its tamping aggregates are distributed across the middle of the rails, can be extended to the side which allows it to be adjusted to various sleeper and track situations.

The benefits at a glance

  • Split-Head equipment for B75 sleepers
  • Combined height-direction laser
  • Modern automatic master computer
  • Automatic switch programming
  • Additional front compactor
  • Minimum track radius of 190 metres

Technical data

Type of machineUniversal tamping machine
ManufacturerPlasser & Theurer
Registration year2000
Total length over buffers33,19 m
Width3,12 m
Height4,15 m
Mass132 t
Axles8
Permissible speed in train set100 km/hRun by itself100 km/h

Motor

ManufacturerCaterpillar
Type3408E
Power503 kW

Your contact partner

Frank Zarbock
(Head of department tamping machines)

The Wiebe Group uses state-of-the-art and versatile equipment to ensure that its work is always in line with the latest track sleeper developments.

Technologies, like the split-head on the universal tamping machine 09-32 4S are not just gimmicks, they help us to master any track or switch situation. The necessary care and flexibility, especially where switches are concerned, can be achieved thanks to the 3-rail lift and 4-rail tamping processes.

Telephone
+49 (0)4202 – 987-412

Telefax
+49 (0)4202 – 987-100

E-Mail
FZarbock@wiebe.de

Other machines

Tamping Express 09-3X

Be it one or three sleepers at the same time, the Tamping Express 09-3X completes the track tamping work quickly and evenly.

To the Tamping Express

09-32 4SY

Thanks to a laser-supported 3-rail lift, even split sleepers can be processed by this very versatile track and switch tamping machine.

To the tamping machine

EM-SAT 120

For effective maintenance of track systems, this track measuring car delivers all relevant data about the actual condition.

To the track measuring car

WSM 08-275 3SY

High-performance tamping of switches for all kinds of sleeper – this is the task of the WSM 08-275 3SY.

To the machine