SUZW-500

Progress in track and technology

When you look at the rail-bound fast conversion machine SUZW-500 , it becomes immediately clear that performance is part of everyday life with this machine from the Wiebe Group. Both the laying of the sleepers and the preparation of a laying grade are bundled in the machine, which is over 230 metres long.

The SUZW-500 is the successful further development of the first generation of rapid conversion machines, with the 500 standing for track conversion performance per hour. Despite all the speed, the conversion machine naturally ensures the highest track construction quality and thus also contributes to the economic efficiency of the (re)built track system.

SUZW-500, Track Construction Machine
Castle Icon
Total mass in tonnes
0
Axis Icon
Axles
0
Slurry Laying Unit Icon
Sleeper laying units
0
Stopwatch Icon
Number of thresholds/minute
0
Gantry Cranes Icon
Gantry cranes
0
Time Icon
Meter/hour work output
0

A special feature: the clearing chain

The SUZW-500 rapid conversion machine is state-of-the-art. In contrast to conventional conversion trains, the construction of the laying grade is carried out by means of a clearing chain. The excess ballast is picked up and transported to the rear in the train in the direction of work. The ballast will then be backfilled in the area where the new rails have already been inserted into the rail bearing.

The advantages at a glance:

  • Powerful fast conversion machine with three gantry cranes
  • Track reconstruction with pre- and post-ballast cleaning
  • First-class track quality
  • Fabrication of the laying grade with the help of a clearing chain
  • No impairment of the neighbouring track
  • Can also be used in narrow bends

Technical data

Machine type
Rail-bound rapid conversion machine
Manufacturer
Plasser & Theurer
First registration
2011
Total length over buffers
153.50 m (with workshop and equipment trolley: 235.20 m)
Width
3.29 m
Height
4.65 m
Weight
631 t
Number of axles
32 (of which 14 are powered)
permissible. Speed on the train
100 km/h (5 km/h when driving on your own)

Performance

Predictable performance
400 m/h
Clearing chain
3.20 m
Drive-through width in working position
4 m
Min. Working radius
200m at altitude ≤ 100 mm
Max. cant
160 mm
Max. longitudinal slope
15 ‰ at R > 500 m
Swivelling options of the track
+/- 100 mm
Min. Radius for shunting operations
120 m
Min. Radius for transfer journeys
150 m
Track reconstruction possible
with preceding bedding cleaning
Possible rail shapes
UIC 60
Possibly. Sleeper forms (extension 2.30 m-2.80 m)
Wood
Possibly. Threshold shapes (installation 2.30 m-2.80 m)
Wood
Track reconstruction possible
with trailing bedding cleaning
Possible rail shapes
R65
Possibly. Sleeper forms (extension 2.30 m-2.80 m)
Concrete
Possibly. Sleeper forms (extension 2.30 m-2.80 m)
Concrete
Track reconstruction possible
without bedding cleaning
Possible rail shapes
S54
Possibly. Sleeper forms (extension 2.30 m-2.80 m)
Bi-Block
Track reconstruction possible
only sleeper change
Possible rail shapes
S49
Possibly. Sleeper forms (extension 2.30 m-2.80 m)
Steel

Project images

The SUZW 500.

The SUZW-500 achieves 400 m of work per hour.

SUZW-500, Track Construction Machine

In contrast to conventional conversion trains, the construction of the laying grade is carried out by means of a clearing chain.

Close-up of the SUZW 500.

The SUZW-500 lays 14 sleepers in one minute.

Close-up of the SUZW 500.

The construction train, which is up to 235 m long, ensures the highest track construction quality.

Other machines

Donelli PTH 350

The Donelli PTH 350 lays and transports track yokes and sleepers – up to 1,000 metres a day.

Donelli PTH 350

Your contact person

Fourteen sleepers per minute is an output that is sought in vain with comparable conversion machines. The SUZW-500 is truly a colossus – in terms of its dimensions, but also its power.

This is a good thing, because it is not only the high working speed and the direct production of a laying grade that make the machine the right choice from an economic point of view; thanks to the guaranteed high quality, the built or renewed track system also convinces with low maintenance costs.

Martin Kepinski

Phone: +49 (0)4202 – 987-412
E-mail: MKepinski@wiebe.de

If you have any questions, we will be happy to help you.

or call us: