Donelli PTH 350

Track laying gantry crane The Donelli PTH 350 track-laying gantry crane from Cemafer is designed for laying, picking, transporting and loading sleepers, track yokes and rails. With a working time of twelve hours and optimal conditions, it is able to achieve a sleeper laying of up to 1,000 meters. Total mass in tonnes 0 Lifting […]
SUZW-500

Progress in track and technology When you look at the rail-bound fast conversion machine SUZW-500 , it becomes immediately clear that performance is part of everyday life with this machine from the Wiebe Group. Both the laying of the sleepers and the preparation of a laying grade are bundled in the machine, which is over […]