Upgrading of the Chemnitztal Viaduct in Chemnitz
Service description:
The 135 m long Chemnitztal Viaduct, km 59.792 of the DB line Neukiritzsch – Chemnitz, consists of 9 natural stone arches, which were supported by a reinforced concrete frame in 1931. Due to the long service life, extensive renovation measures were necessary. The masonry was renewed or replaced, and the grouting was completely renewed. The remediation of the visible surfaces was carried out with a surface protection system, exposed irons were provided with an adhesive primer before repair. After the reinforcement of the reinforced concrete arches, a back-anchored shotcrete shell was applied to the 9 masonry arches. Cavities between masonry and reinforced concrete were grouted.
Client:
DB Netz AG Southeast
Period:
From December 2018 to June 2020
Technical specifications:
clear width arches 1-8: approx. 9.80 m
Clear width arch 9: 11.80 m
Clear arch height: 5.20 – 7.00 m
Surface Protection System: OS-D
PCC repair: Mortar RM
Cavity grouting: C3A free trash cement mortar
Contract amount: approx. € 5.38 million
Project images
Site in need of renovation on the Chemnitztal Viaduct
the Chemnitztal Viaduct after the renovation
Your contact person
Would you like us to work for you with this machine for track construction work of all kinds? Or just detailed information about our machinery? Feel free to contact me!
Due to the variety of possible track construction projects – be it new construction, conversion, dismantling or maintenance – the Wiebe Group has a wide range of machinery. In this way, we ensure that we can meet every task with the right machine or machine network.
If you have any questions, we will be happy to help you.