Project details
- Expansion of the municipal tracks in Wismar
- Connecting the sidings of the Hanseatic City of Wismar with the seaport of Wismar and the DB line 7367
- Construction period: January 2023 to October 2024.
- Construction stage 1: Erection of 158 bored piles up to 23m depth, construction of a 70 cm reinforced concrete support slab of 235m length and 20m width for tracks and new 4 points including drainage system and lighting
- Construction stage 2: 500m of track on concrete base course parallel to the existing track with drainage system, lighting and underground cable construction
Your contact person
Although the three municipalities may be close to each other, it is still important to ensure a smooth networking of the people in the region.
As a track construction specialist, it does not matter to us whether the route to be worked on is long-distance or regional: the track remains the track. And since rail transport plays an important role in passenger and goods transport in the long term, the best quality is the absolute standard in each of our projects. The special feature here: Our new Stopfexpress 09-3X, which we received at the iaf 2017, celebrated its first use here.
David Schmitter (Abteilungsleiter Gleisbau)
Phone: +49 (0)4202 – 987-294
E-mail: DSchmitter@wiebe.de
Kai Legenhausen (Managing Director)
Phone: +49 (0)4202 – 987-0
Fax: +49 (0)4202 – 987-100
E-mail: KLegenhausen@wiebe.de
If you have any questions, we will be happy to help you.
or call us: