Service description:
The Magdeburg Eichenweiler transport station on route 6402 Magdeburg – Stendal was modernised in 2023. For this purpose, the existing platform surface on both tracks was replaced by prefabricated elements of the modular platform system MBS-SB. The central core between the prefabricated elements was designed conventionally.
In the course of this, the platform roof was also renovated.
Client:
DB Station & Service AG
Construction time:
April 2023 – August 2023
Order amount:
approx. 1.5 million €
Technical specifications:
- Type of structure: Precast platform type MBS-SB, precast panels standardized
- Length: 2 x 155 m
- Width: 2 x 1.75 m + center core
- Foundation: Laying the precast slabs on a concrete levelling layer
Project images
New precast panels on old existing substructure
Completed island platform
Your contact person
Although the three municipalities may be close to each other, it is still important to ensure a smooth networking of the people in the region.
As a track construction specialist, it does not matter to us whether the route to be worked on is long-distance or regional: the track remains the track. And since rail transport plays an important role in passenger and goods transport in the long term, the best quality is the absolute standard in each of our projects. The special feature here: Our new Stopfexpress 09-3X, which we received at the iaf 2017, celebrated its first use here.
David Schmitter (Abteilungsleiter Gleisbau)
Phone: +49 (0)4202 – 987-294
E-mail: DSchmitter@wiebe.de
Kai Legenhausen (Managing Director)
Phone: +49 (0)4202 – 987-0
Fax: +49 (0)4202 – 987-100
E-mail: KLegenhausen@wiebe.de
If you have any questions, we will be happy to help you.
or call us: