- Construction period April 2022 – April 2024
- Terrain levelling and soil replacement
- Earthworks for the new construction of the workshop building complex
- New track systems (approx. 2500m) and switches
- New construction of OLA and EOW facility as well as track field lighting
- Production of media systems (waste water and protective water, drinking water supply, extinguishing water basins, seepage basins)
- New interior cleaning plant
- Construction of elevated track system in the workshop building complex
- Construction of traffic and installation areas
- Construction of fence and gate system
- Dewatering
- Equipment elements
Your contact person
Although the three municipalities may be close to each other, it is still important to ensure a smooth networking of the people in the region.
As a track construction specialist, it does not matter to us whether the route to be worked on is long-distance or regional: the track remains the track. And since rail transport plays an important role in passenger and goods transport in the long term, the best quality is the absolute standard in each of our projects. The special feature here: Our new Stopfexpress 09-3X, which we received at the iaf 2017, celebrated its first use here.
David Schmitter (Abteilungsleiter Gleisbau)
Phone: +49 (0)4202 – 987-294
E-mail: DSchmitter@wiebe.de
Kai Legenhausen (Managing Director)
Phone: +49 (0)4202 – 987-0
Fax: +49 (0)4202 – 987-100
E-mail: KLegenhausen@wiebe.de
If you have any questions, we will be happy to help you.
or call us: